亚洲欧美另类久久久精品2019,国产激情情久久久护士女,久9久9热综合,国产精品69久久久,亚洲在线视频网站,亚洲免费国产视频,一区二区视频免费在线观看

Heat Source Operation
Current location: Home >> Products and Business >> Heat Source Operation

Daqing Zhenfu Heating Co., Ltd.


        In 1998, a total investment of 195 million yuan was made to construct the Dongfeng New Village Central Heating System Project - Daqing Zhenfu Heating Co., Ltd.
        The company mainly engages in heat source management, with a heating capacity of 380T/H, undertaking centralized heating for 5.2 million square meters of building area in Daqing Dongfeng New Village District 7, District 9, District 10, People's Hospital, Daqing Petroleum Institute, south of Dawn Lake, Xiangge Garden, Nanhu Jingyuan, Vienna Music Garden, Juying International and other areas.  The company has the only one SZL72-1.6/150/90A II type 100-ton hot water boiler and 7 DHL29-1.6/150/90A III type 40-ton hot water boilers in the three northeastern provinces of China, which are currently leading in China.The main equipment, including the air blower, circulating water pump and slag remover, all use advanced domestic equipment.The fully automatic softener is imported from the United States, with good water quality, fast water output, time and labor saving, high modernization level, advanced instrument control system, making the boiler in full automatic monitoring operation.
        In production management, a modern microcomputer management system is used to monitor the operation of the boiler and various technical parameters, improving work efficiency.In production and operation management, the company focuses on cost management, saves energy, maximizes equipment efficiency, avoids energy loss, and reduces costs and improves efficiency.
In terms of safety production, we strictly follow the safe operation procedures of the boiler and implement the principle of "safety for all and production for everyone".
        The company invested 2 million yuan in greening the boiler room.  In order to realize the idea of building a garden-style factory proposed by the company at the beginning of the construction of the boiler room, a modern enclosed coal storage yard with a reserve of 40,000 tons, a railway transportation dedicated line with a coal storage of 30,000 tons, and a transportation team consisting of 10 tractors, 15-ton dump trucks, and 2 Shandong 160-type bulldozers were successively built to ensure the storage and transportation of coal in a coordinated manner.
       In response to the national policy of energy conservation and emission reduction, the enterprise has taken the initiative to purchase a set of SCQT dust removal, desulfurization and denitrification three-dimensional integrated purification equipment for flue gas from coal-fired industrial boilers with self-raised funds of more than 30 million yuan in early 2014, in order to reduce the emission of sulfur dioxide, nitrogen oxides and smoke dust.In order to implement the scientific outlook on development and contribute to the construction of a resource-saving and environmentally friendly society.
       Daqing Zhenfu Heating Co., Ltd. will uphold the tenet of "safe production, economic operation, low consumption and environmental protection" and do its best to make the "lifeline project" for the people.